The Forensic Engineer and the Delay Claim
DOI:
https://doi.org/10.51501/jotnafe.v1i2.380Abstract
All things change it seems and the Delay Claim too is changing. Ive had the opportunity to participate in and observe Delay Claims for almost twenty years and can see some trends which are of interest and note to the Forensic Engineer. In the past several years, the construction industry has become highly litigious and this has led more lawyers and engineers to enter the claims practice. The slow down in construction over the past several years has also led to a fair number of do-it-yourself contractor claimants. All these folks practicing new trades tend to generate more claims and disputes. Recently I have heard people say the delay claim business has been more sophisticated. This is a word our society uses to front for what is simply bad taste in entertainment, literature, hosts of other things and recently many delay claims. I believe an experts most important attribute is integrity and that brings me to three points I want to make to this distinguished group. They arePublished
1984-01-01
How to Cite
Hohns, H. Murray. 1984. “The Forensic Engineer and the Delay Claim”. Journal of the National Academy of Forensic Engineers 1 (2). https://doi.org/10.51501/jotnafe.v1i2.380.
Issue
Section
Articles
License
Copyright (c) 1984 National Academy of Forensic Engineers
This work is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
All rights © Journal of the National Academy of Forensic Engineers.
Full statement regarding the author's license of copyright to the NAFE is shown on the Copyright section of the Submissions Page.