[1]
Haglid, K.C. 2005. Forensic Engineering Evaluation Of Mismanaged Renovation Exposes A Pattern Of Possible Delay Actions. Journal of the National Academy of Forensic Engineers. 22, 2 (Jan. 2005). DOI:https://doi.org/10.51501/jotnafe.v22i2.649.