Haglid, K. C. (2005) “Forensic Engineering Evaluation Of Mismanaged Renovation Exposes A Pattern Of Possible Delay Actions”, Journal of the National Academy of Forensic Engineers, 22(2). doi: 10.51501/jotnafe.v22i2.649.